Bring the evidence together
Create a private firm project, enter the building details, and attach prior reports, invoices, photos, and financial records.
BC STRATA REPORT WORKSPACE
ReserveIQ helps qualified professionals turn building evidence into a traceable 30-year depreciation-report draft—without giving up control of the assumptions, funding models, or final sign-off.
Two assumptions need professional review.
Every suggested value shows its basis before it reaches the forecast.
THE WORK TODAY
Depreciation reports combine site evidence, component inventories, cost assumptions, 30-year cash-flow models, and a long-form document. In many firms, those pieces still move between spreadsheets, Word files, inboxes, and version names.
ReserveIQ gives the author one project record from intake to draft—so time goes into inspection and judgment instead of rebuilding the same tables.
Create a private firm project, enter the building details, and attach prior reports, invoices, photos, and financial records.
Turn roofs, elevators, windows, mechanical systems, and other common property into editable service-life and cost assumptions.
See replacement events, inflation-adjusted costs, and three funding scenarios update as the professional changes the inputs.
A review queue keeps low-confidence or unverified figures visible. Nothing is silently treated as professional judgment.
Generate a structured depreciation-report draft with sources, assumptions, scenarios, and a permanent professional-review watermark.
LIVE, EXPLAINABLE MODEL
Change a service life, current cost, inflation rate, interest rate, contingency, or opening reserve balance. The replacement schedule and funding scenarios recalculate immediately.
THE LIABILITY ANSWER
01No automatic final reportEvery output is visibly marked “Draft for professional review.”
02Every number keeps its basisInstall year, service life, cost source, confidence, and review state stay attached.
03Human review gates stay openUnverified assumptions remain visible until the author resolves them.
04Firm data stays separatedEach pilot firm receives a private workspace with its own projects and access code.
WORKING PILOT
Provision isolated firm workspaces and private project records.
Save revisions, source documents, and audit events to Cloudflare.
Model components, capital events, and three funding approaches.
Print or save a structured, review-watermarked professional draft.
WHY NOW
BC strata corporations with five or more lots must obtain a depreciation report on a five-year cycle. The report covers a 30-year physical and financial forecast and must be prepared by a designated qualified person.
The adjacent electrical-planning-report requirement creates another professional workflow for assessing current capacity and future demand such as EV charging and heat pumps.
10-FIRM DESIGN-PARTNER PROGRAM
We are inviting a small group of BC report providers to pilot ReserveIQ on two or three upcoming buildings at no software cost. The goal is simple: measure drafting time, find the missing controls, and decide whether the workflow deserves a paid rollout.
2–3 real building files
60 days of pilot access
3 structured feedback check-ins
$0 software fee during pilot
Enter your firm code →